 Description:


 

The purpose of the STR is to show how much of the system has been built and tested and to demonstrate the functionality currently exists. This review aids with the DR at Wallops as it captures the final design of both the rocket systems and the experiements (you) that are going to fly.  YOU MUST ADDRESS AND FOLLOW EVERY ASPECT OF THIS TEMPLATE DURING YOUR TEAM’S REVIEW.  PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS.

The format of the review is the same as that for the CoDR, PDR, and CDR (presentation given via zoom). All STR delieverables shall be submitted to Chris Koehler via your team's Dropbox folder at least 8 hours before your scheduled review time.

Your presentation should focus on the following elements:

  1. Mission Overview
  2. Final Design Description
  3. Hardware Procurement Status
  4. Subsystem Testing Results
  5. Plan for ISTR
  6. Plan for FMSR
  7. User Guide Compliance
  8. Project Management Update

 

STR Template